Our design can be applied to any industry, utility, oil & gas, petrochemicals, etc.

We supply Air-Insulated Switchgear (AIS) as well as Gas-Insulated Switchgear (GIS) in order to provide a cost- efficient and well-proven solution to our clients.

We can also provide substations related to our client’s special requirements such as reduced surface, polluted area, compact type, indoor type, etc.

All design and engineering works are tailored by our skilled personnel, according to each client’s requirement and based on IEC standard.

In order to provide grid operators and owners with highest efficiency and increased productivity, we usually use Digital Control System (DCS) based on IEC 61850, with software and hardware supplied by well-known manufacturers. Conventional type control system can also be provided in case of request.

 

 

145 KV & 72.5 KV

Projects executed

  1. DARYASAR & 4 OTHERS, 5 No. 63/20 KV, AIS Substations / MAZANDARAN R.E.Co. - 1986
  2. BANDAR IMAM, 63/20KV, AIS Substations / BANDAR IMAM petroch. Co. - 1987
  3. SANYE DEFA, 2 No. 63/20 KV, AIS Substation / SANAYE DEFE Industries Co. - 1990
  4. CHALOUS & 20 OTHERS, 21 No. 63/20 KV, AIS Subs. & Ext. / MZANDARAN R.E.Co. - 1992
  5. POSHTKOOH & 2 OTHERS, 3 No. 63/20 KV, AIS Substations / YAZD R.E.Co. – 1993
  6. FOULAD MEYBOD, 63/20 KV, AIS Substations / MEYBOD Steel Co. – 1994
  7. POLYACRIL, 63/20 KV, AIS Substations / POLYACRIL Industries  Co. – 1994
  8. FARS, 6 No. 66 KV, AIS Substations renovation / FARS R.E.Co. – 1995
  9. MAZANDARAN, 63 KV, AIS Substations Equipment /  MAZANDARAN R.E.Co. – 1996
  10. KALA NAFT, 2 No. 63/20 KV, AIS Substations / N.I.O.Co. – 1996
  11. PEDEEE, 6 No. 63/20 KV, AIS Substations / PEDEEE – Syria,2001
  12. BANBAR ABB. & KAHOO., 2 No. 63/20 KV, AIS Substations / HORMOZGAN R.E.Co. – 2001
  13. SEMNAN & 2 OTHERS, 3 No. 63/20 KV, AIS Subs. Extension / SEMNAN R.E.Co. – 2001
  14. SARI & 2 OTHERS, 3 No. 63/20 KV, AIS Substations / MAZANDARAN R.E.Co. – 2002
  15. AMOL 2 & 4 OTHERS, 5 No. 63/20 KV, AIS Subs. Extension / MAZANDARAN R.E.Co. – 2002
  16. AHMAD CHAL. & 2 OTHERS, 3 No. 63/20 KV, AIS Substations / MAZANDARAN R.E.Co. – 2002
  17. DEHBID & KENAREH, 2 No. 63/20 KV, AIS Substations / FARS R.E.Co. – 2003
  18. FERDOWSI, 63/20 KV, GIS Substation / KHORASAN R.E.Co. – 2004
  19. TEHRAN, 10 No. 63/20 KV, AIS Substations / TEHRAN R.E.Co. – 2004
  20. SHIRGAH & 2 OTHERS, 3 No. 63/20 KV, AIS Substations / MAZANDARAN R.E.Co. – 2004
  21. ALIABAD & GORGAN, 2 No. 63/20 KV, AIS & GIS Substations / MAZANDARAN R.E.Co. – 2005
  22. SIRJAN & 5 OTHERS, 63/20 KV, AIS Subs. & 132/20 KV, Ext. / KERMAN R.E.Co. – 2007
  23. ABADAN & 2 OTHERS, 3 No. 132/20 KV, AIS Substations / KHUZESTAN R.E.Co. – 2007
  24. ASALOUYEH, 5 No. 132/20 KV, AIS Substations / ENERGY PARS Co. – 2008
  25. MELLIRAH & 2 OTHERS, 3 No. 132/33 KV, AIS Substations / KHUZESTAN R.E.Co. – 2008
  26. TARBIAT, 132/33 KV, GIS Substation / KHORASAN R.E.Co. – 2009
  27. ASALUYEH PHASE 19, 132/33 KV, AIS Substation / PETRO PARS Co. – 2010
  28. ASALUYEH PHASE 22-24, 132/33 KV, AIS Substation / PETROSINA Co. – 2014
  29. ABGIR 2, 132/33 KV, AIS Substation / PARS OIL & GAS Co. – 2014
  30. ARAK 6, 63/20 KV, GIS Substations / BAKHTAR R.E.Co. – 2015
  31. ABARKOOH, 132/20 KV, AIS Substation / YAZD R.E.Co. – 2016


Projects under execution

  1. TEHRAN, 5 No. 63/20 KV, GIS Substations / TEHRAN R.E.Co. - 2020
  2. KHODA AFARIN 4, 132/20 KV, AIS Substation / ARDABIL R.W.Co. – 2020
  3. HAJILARCHAI, 2 No. 63/20 KV, GIS Substations /  NATIONAL COPPER Indust. – 2020

 


245 KV


Projects executed

  1. KERMANSHAH, 230 KV, AIS Substation Extension / GHARB R.E.Co. - 1996
  2. SORMAGH, 230/66 KV,  AIS Substation / FARS R.E.Co. - 1997
  3. SOUTH OF AHWAZ, 230 KV & 132 KV, AIS Feeders / KHUZESTAN R.E.Co. – 1998
  4. BAM, 230/132 KV, AIS Substation / KERMAN R.E.Co. - IR ,1998
  5. BAGHEIN,  230 KV, AIS Substation Extension / KERMAN R.E.Co. - 1998
  6. ANBAR ABAD,  230/132 KV, AIS Substation Extension / KERMAN R.E.Co. - 1998
  7. RAFSANJAN,  230/132 KV, AIS Substation Extension / KERMAN R.E.Co. - 1998
  8. PAZANAN, 230/11 KV,  AIS Substation Extension", N.I.O.E.Co. – 2000
  9. GHACHSARAN & DEYLAMAN, 230/11 KV,  AIS Substation", N.I.O.E.Co. - 2000
  10. ABB.&17 OTHERS, 18 No. 400 KV&230 KV, AIS Substations", I.P.D.Co. - 2000
  11. FUMAN, 230 KV, AIS Substation / GUILAN R.E.Co. - 2001
  12. TAKESTAN, 230/63 KV, AIS Substation / ZANJAN R.E.Co. - 2003
  13. ABHAR & 2 OTHERS, 3 No. 230/63 KV, AIS Subs. Ext. / ZANJAN R.E.Co. - 2004
  14. MINAB, 230/63 KV, AIS Substation / HORMOZGAN R.E.Co. - IR ,2005
  15. BARDSIR, 230/132/20KV, AIS Substation / KERMAN R.E.Co. – 2006
  16. DANDI, 230 kV, AIS Substation / ZANJAN R.E.Co. - 2006
  17. OMIDIEH & 2 OTHERS. 3 No. 230KV,  AIS Substations / KHUZESTAN R.E.Co. – 2006
  18. TOBEN, TOBA, KAOLAK, 3 No. 230/63 KV, AIS Substations / SENELEC - SENEGAL,2008
  19. ALI ABAD. 230KV, AIS Substation / GOLESTAN R.E.Co. - 2008
  20. AZODI, 230/63 kV, GIS Substation / GUILAN R.E.Co. - 2009
  21. JAKDAN, 230/63/20KV, AIS Substation / HORMOZGAN R.E.Co. – 2014
  22. ABARKOOH, 230/132 KV, AIS Substation / YAZD R.E.Co. – 2015
  23. ARDEBIL, 230/132 KV, AIS Substation / AZARBAYJAN R.E.Co. - IR ,2018
  24. KHALKHAL, 230/132 KV, AIS Substation / AZARBAYJAN R.E.Co. - IR ,2018
  25. TABRIZ, 230/132, GIS Substation / AZARBAYJAN R.E.Co. - IR ,2018

 

Projects under execution

  1. NIKSHAHR, 230/63 KV, AIS Substation / SIST. & BALOOCH. R.E.Co. - 2020
  2. ABE JAVEH, 2No. 230/11 KV, AIS Substations and transmission line / I.W.P.D.Co. - 2020
  3. SARCHESHMEH, 230/20 KV, AIS Substation Extension / KERMAN R.E.Co. - 2020
  4. SABZ AB, 230/132/20 KV, AIS Substation / KHUZESTAN R.E.Co. - 2020
  5. URUMIEH , 230 KV AIS Substation Extension / AZARBAYJAN R.E.Co. - 2020

 


420 KV


Projects executed

  1. TORBAT JAM , 400/230/63 KV,  AIS Substation / I.P.D.C. - 2000
  2. SOUTH ESFAHAN , 400/230/63 KV,  AIS Substation / I.P.D.C. - 2000
  3. TOOS ,  400/230/63 KV AIS Substation / I.P.D.C. - 2000
  4. TAKESTAN , Extension to 400 KV, AIS Substation / ZANJAN R.E.Co. - 2002
  5. SAVEH ,  400 KV,  AIS Substation / BAKHTAR R.E.Co. - 2006
  6. FAJR , 400/132 KV AIS/GIS Substation &132 KV transmission cable / FAJR Petrochemical Co.,2006
  7. KAROON 4 ,  400 KV, GIS Substation / I.W.P.D.Co. – 2007
  8. GOTVAND ,  400 KV, GIS Substation & 400KV transmission line / I.W.P.D.Co. - 2007
  9. BIRJAND ,  400/132/20 KV, AIS Substation / KHORASAN R.E.Co. - 2008
  10. ZAHEDAN , 400/230/63/20 KV, AIS Substation / SIST. & BALOOCH. R.E.Co. - 2009
  11. FIROOZKOOH , 400/63 KV, AIS Substation / TEHRAN R.E.Co. - 2012
  12. SAADAT ABAD , 400/63 KV, GIS Substation / TEHRAN R.E.Co. - 2012
  13. LORDEGAN, 400/63 KV, AIS Subs. & SHAHR KORD, 400 kV Ext. / ESFAHAN R.E.Co. - 2015
  14. SOLTANIEH ,  400/230 KV, AIS Substation / ZANJAN R.E.Co. - 2016
  15. BIRJAND ,  400/132/20 KV, AIS Substation Extension / KHORASAN R.E.Co. - 2017
  16. DASHT ABI ,  400/63 KV, AIS Substation Extension / ZANJAN R.E.Co. - 2018
  17. SOLTANIEH ,  400/230 KV, AIS Substation Extension / ZANJAN R.E.Co. – 2018


Projects under execution

  1. NARIVARAN ,  400/230 KV, AIS Substation Extension / MAZANDARAN R.E.Co. - 2020
  2. GALLEHDAR ,  400 KV, AIS Substation / KHATAMOL ANBIA Co. - 2020
  3. URUMIEH ,  400 KV AIS Substation & 400 KV Transmission line / TADBIR SAZAN  Co. - 2020